PTOD-OS Federal reviews a contractor's small business subcontracting plan against every element the governing clause requires, element by element, and prepares a determination memorandum. It finds what is in the document. It does not decide what to do about it.
This block appears on every memorandum the system produces. It is always blank. There is no automated approval path anywhere in the product.
What it reviews
The clause enumerates what a subcontracting plan must contain. Twelve of those elements are objective — a requirement is present in the document or it is not — and their status is computed by a written rule. Three call for judgment about whether a description is adequate, and those are referred to the Director rather than decided.
Some agencies require more. VA adds four elements through VAAR 852.219-70, so a VA review evaluates eighteen rather than fifteen — cited to VAAR, not to the FAR.
The distinction that matters
A plan can address every element and still fall short. Treating those two situations identically is what makes automated compliance tools useless to a reviewer — everything becomes a finding, or nothing does. Below is an actual review of a plan where all fifteen elements are present.
Three deficiencies, several judgment items, and a reason attached to each. Run the same plan again tomorrow and the deficiencies are identical — because a rule decides them, not a model.
What the system declares about itself
Some things cannot be verified from a submitted document. Where that is true, the memorandum says so on its face — before the determination block, where the signer will read it.
A determination resting on an unverified premise should say so where the person signing it will see it, not in a configuration file nobody opens. Most systems of this kind cannot answer the question “what did you assume?” at all.
Delivery
Methodology, platform, and federal infrastructure are held by parties that each answer for their own part.
The PTOD-OS organizational intelligence framework and the analytic approach behind the review.
Engineering, the evaluation engine, and the determination record — adapted from a regulated-industry review system already in production.
Contracting entity, registered in SAM, with FedRAMP-authorized hosting. Contractor-submitted material is processed inside that authorized environment.
Walkthrough
A short walkthrough of the review, element by element, from a submitted plan to a memorandum ready for signature.
Plans shown are synthetic — fictional entities written to exercise the system. No contractor-submitted material appears in this recording.
Next step
A thirty-minute walkthrough: a compliant plan clearing with no findings, a deficient one producing a full deficiency record, and the case that matters — a plan where every element is present and three are substantively absent.
Access to the review system is issued to named individuals. Credentials are required at sign-in.
PTOD-OS Federal performs structured evaluation and prepares determination records. It does not accept, reject, or return subcontracting plans, and it makes no determination. Every determination is made and signed by the cognizant official. Capability demonstrated against synthetic subcontracting plans; agency deployment is scoped and authorized on a per-engagement basis.